My inspector just left telling me a ‘block’ is required to give my copper pipes stablilty where they come up and out thru my new framing. They are stubbed out and awaiting drywall & base cabinet. Does anyone know what this means or have a link showing how to do it? I don’t really want to call the plumber back in, would rather try to do it myself.