I agree with RP that if you are using Cu pipe underground you should use the heaviest gauge. However, it is always preferrable to use a continuous run of such pipe underground, ideally withou ANY joints, brazed, flared, compression, soldered, or otherwise. For this purpose heavy guage bendable copper pipe is preferred.
I suspect that RP may be confusing “brazing” and “soldering.” These are two different processes.
Soldering is the process of joining metals (usually similar, such as Cu-Cu, by connecting them with a relatively low-melting-point “solder,” usually a lead-tin alloy heated to a temperature that does not melt the conjoined metals. “Brazing,” on the other hand requires higher temperatures that may melt the metals that are meant to be joined, resulting in a stronger “welded” joint, sometimes involving dissimilar metals.
“Brazing” Cu pipe joints I’m sure is possible, but would be difficult to do properly. Such joints in K, L, or M schedule pipe are best soldered and not brazed.
In my practice, I use either non-jointed continuous runs of flexible copper pipe underground, or I use threaded pipe.
NtP