when installing a 3 piece corner shower how far from the shower base top flange should the drywall be? also the instructions from the company said to use a primer on the plastic base before applying the silicon caulk to seal the joints,but the primer wasnt in the box, any ideas as to what the primer may be ? ie: acetone, denatured alchohol ?
Author
Posts
Viewing 0 reply threads
The forum ‘Old Bulletin Board Archives’ is closed to new topics and replies.