SUPER WATER HEATER

Home Forums Archives Old Bulletin Board Archives SUPER WATER HEATER

Viewing 4 reply threads
  • Author
    Posts
    • #280426
      Avatar photoJohn MacKenzie

        HAVING A PROBLEM WITH NOT ENOUGH HOT WATER ? RUN ANOTHER CIRCUIT TO THE BOTTOM ELEMENT. CLIP THE WIRE FROM THE TOP ELEMENT TO THE BOTTOM, ONE OR BOTH ELEMENTS CAN HEAT WHEN THEY NEED TO. YOU WILL NEVER RUN OUR OF HOT WATER, OR YOU WILL HAVE A BETTER CHANCE OF HAVING HOT WATER WHEN YOU NEED IT.THOMAS WAYNE BELL, AN OLD ELECTRICIAN, RETIRED………

      • #305424
        Avatar photoTHOMAS WAYNE BELL
        Participant

          1: The lower thermstat has to be replaced with one which has an ECO switch on it. 2: The manufacturers warranty is void if it is field rewired.: HAVING A PROBLEM WITH NOT ENOUGH HOT WATER ? RUN ANOTHER CIRCUIT TO THE BOTTOM ELEMENT. : CLIP THE WIRE FROM THE TOP ELEMENT TO THE BOTTOM, ONE OR BOTH ELEMENTS CAN HEAT WHEN THEY NEED TO. : YOU WILL NEVER RUN OUR OF HOT WATER, OR YOU WILL HAVE A BETTER CHANCE OF HAVING HOT WATER : WHEN YOU NEED IT.: : THOMAS WAYNE BELL, AN OLD ELECTRICIAN, RETIRED………

        • #305425
          Avatar photoTHOMAS WAYNE BELL
          Participant

            1: The lower thermstat has to be replaced with one which has an ECO switch on it. 2: The manufacturers warranty is void if it is field rewired.: HAVING A PROBLEM WITH NOT ENOUGH HOT WATER ? RUN ANOTHER CIRCUIT TO THE BOTTOM ELEMENT. : CLIP THE WIRE FROM THE TOP ELEMENT TO THE BOTTOM, ONE OR BOTH ELEMENTS CAN HEAT WHEN THEY NEED TO. : YOU WILL NEVER RUN OUR OF HOT WATER, OR YOU WILL HAVE A BETTER CHANCE OF HAVING HOT WATER : WHEN YOU NEED IT.: : THOMAS WAYNE BELL, AN OLD ELECTRICIAN, RETIRED………

          • #305434
            Avatar photoTHOMAS WAYNE BELL
            Participant

              In addition to hjs post, measures must be implemented to prevent the electric power line (from the pole to the house)from sagging down when the simultaneous 9 KW load kicks in. Bud.: HAVING A PROBLEM WITH NOT ENOUGH HOT WATER ? RUN ANOTHER CIRCUIT TO THE BOTTOM ELEMENT. : CLIP THE WIRE FROM THE TOP ELEMENT TO THE BOTTOM, ONE OR BOTH ELEMENTS CAN HEAT WHEN THEY NEED TO. : YOU WILL NEVER RUN OUR OF HOT WATER, OR YOU WILL HAVE A BETTER CHANCE OF HAVING HOT WATER : WHEN YOU NEED IT.: : THOMAS WAYNE BELL, AN OLD ELECTRICIAN, RETIRED………

            • #305435
              Avatar photoTHOMAS WAYNE BELL
              Participant

                In addition to hjs post, measures must be implemented to prevent the electric power line (from the pole to the house)from sagging down when the simultaneous 9 KW load kicks in. Bud.: HAVING A PROBLEM WITH NOT ENOUGH HOT WATER ? RUN ANOTHER CIRCUIT TO THE BOTTOM ELEMENT. : CLIP THE WIRE FROM THE TOP ELEMENT TO THE BOTTOM, ONE OR BOTH ELEMENTS CAN HEAT WHEN THEY NEED TO. : YOU WILL NEVER RUN OUR OF HOT WATER, OR YOU WILL HAVE A BETTER CHANCE OF HAVING HOT WATER : WHEN YOU NEED IT.: : THOMAS WAYNE BELL, AN OLD ELECTRICIAN, RETIRED………

            Viewing 4 reply threads
            • The forum ‘Old Bulletin Board Archives’ is closed to new topics and replies.

            Pin It on Pinterest

            Share This