putting toliet in a warehouse have plans on sewer line but no stack is their a machine or method in which to find the stack through 4 inches of concrete other then jackhammeringor a switch?
Author
Posts
Viewing 0 reply threads
The forum ‘Old Bulletin Board Archives’ is closed to new topics and replies.