I am installing (2)10′, (1)7′, & (2)5′ sections of baseboard in basement. Should each section be piped separately? Can all sections be piped in on series loop? If so, can I pipe the supply in bottom fitting and return on top fitting? Does each section need a bleeder valve on it? If this is the case I cannot pipe return on top fitting. Basically what is the proper installation?