adding toilet and shower to basement. using 3 plastic pipe connecting to existing 3 iron pipe. need to know how much slope per foot i should have. maximum distance about 8.
Minimum slope 1/8 per foot…solids move best at 1/4 per foot… do not exceed 1/2 per foot or the liquids will run ahead of the solids, and they will clog up your pipe. Check your local code regarding the vent…Good luck!: adding toilet and shower to basement. using 3 plastic pipe connecting to existing 3 iron pipe. need to know how much slope per foot i should have. maximum distance about 8.
Minimum slope 1/8 per foot…solids move best at 1/4 per foot… do not exceed 1/2 per foot or the liquids will run ahead of the solids, and they will clog up your pipe. Check your local code regarding the vent…Good luck!: adding toilet and shower to basement. using 3 plastic pipe connecting to existing 3 iron pipe. need to know how much slope per foot i should have. maximum distance about 8.
We are one of the biggest slope contractor in Hong Kong and we are currently expading our business in trading.Would you like to talk?Regards,John Yau Contracts Manager
We are one of the biggest slope contractor in Hong Kong and we are currently expading our business in trading.Would you like to talk?Regards,John Yau Contracts Manager
Author
Posts
Viewing 4 reply threads
The forum ‘Old Bulletin Board Archives’ is closed to new topics and replies.