I have an unfinished basement. The floor is concrete and there are drains for a shower and toilet left by the builder. The drain for the shower is 1 inch above the concrete floor with a 2 inch cap covering it. The toilet drain is 1/2 inch above the concrete floor with a 2 1/2 inch cap covering it.What height should I cut each of the two drains respectively in order to put a shower drain and a toilet flange before fixing a shower and toilet onto them?What would be the height of the shower drain and toilet flange from the tile floor I will be placing on top of the now present concrete floor?Thank you for both your time and advice.