We are in need of the tubing to lay in concrete for floor heat. Our application is the car wash industry and this is needed so the bays will not ice up. The tubing will be attached to a Weben Jarco boiler. We need 400 feet of tubing with conectors and manifords.
You should also consider a heat exchanger, this will allow you to temper the water going to the slab and keep it as a seperate system when you add glycol to it….Lou
Author
Posts
Viewing 1 reply thread
The forum ‘Old Bulletin Board Archives’ is closed to new topics and replies.