I have a project that requires the integration of plumbing + drainage systems in a 14 floor mixed usage building, the lower part is retail and the upper part is a ten floor office tower. How should I arrange the stacks and vents? How are they connected to the sewer tie? (its an exam question)
Author
Posts
Viewing 0 reply threads
The forum ‘Old Bulletin Board Archives’ is closed to new topics and replies.