The directions with the tray instruct the installer to mount it on water restant ‘green’ chipboard and ensure that the bottom of the tray is fully covered with a 5mm bedding layer of silcone or mortar. It then goes on to suggest that the unslotted waste should be taken through the tray and the chipboard sandwiching both with the backnut. Is this the correct method to install the waste, rather than fixing the waste to the tray only and leaving a clearance hole in the chipboard for the backnut. Thank you.